KTM Komuter Timetable (1 & 11 July 2016)

92 Class

The KTM Komuter timetable has changed on 1 July 2016 for the Northern Sector and will be changed on 11 July 2016 for the Klang Valley Sector.

TRAINS1M2 KTM Komuter Northern Sector

The KTM Komuter Northern Sector now operates with hourly services from Butterworth to Kamunting and Padang Besar during peak periods, and every 2 hours during off-peak periods. All trains on the Butterworth – Padang Besar sector will also ply the full route instead of some terminating at Gurun, increasing frequency throughout the line.

TRAINS1M2 KTM Komuter Klang Valley Sector

The KTM Komuter Klang Valley Sector‘s Batu Caves – Seremban Line will operate through services to Pulau Sebang (Tampin). Passengers travelling to and from Senawang, Sungai Gadut, Rembau and Pulau Sebang (Tampin) no longer need to change trains at Seremban.

For more information, click the respective links to the dedicated pages.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s