New KTM Timetable effective 29 July 2020 | KTM Berhad Train Service Updates | Perkhidmatan Tren KTM Berhad | 马来亚铁道公司火车服务更新

There are new timetables for inter-city and inter-state KTM Berhad train services effective 29 July 2020, with service back to pre-COVID-19 levels. In total, there are 40 ETS services and 18 KTM Intercity services daily. Here is the timetable listing of the network.

Tickets for these train services are on sale from Saturday, 11 July 2020 at 8.30am onwards.

KTM ETS Train Services

ETS Northbound Timetable effective 29 July 2020

ETS Timetable Northbound 20200729

ETS Southbound Timetable effective 29 July 2020

ETS Timetable Southbound 20200729

KTM Intercity Train Services

No KTM Intercity timetables have been posted or reposted from KTM Berhad. For now, it should safely be assumed that existing timetables will continue to be used. I will check again manually once tickets are open for booking.

KTM Intercity Northbound Timetable effective 26 June 2020

KTM Intercity Southbound Timetable effective 26 June 2020

Ekspres Selatan Timetable effective 26 June 2020

KTM Intercity Ekspres Selatan Timetable 26 June Southbound

Northbound KTM East Coast Line Timetable effective 26 June 2020

KTM Intercity ECL Timetable 26 June Northbound

Southbound KTM East Coast Line Timetable effective 26 June 2020

KTM Intercity ECL Timetable 26 June Southbound

KTM Shuttle Tebrau Train Services

JB Sentral – Woodlands CIQ
Woodlands CIQ – JB Sentral

⚠️ NO TRAIN SERVICE.

The Shuttle Tebrau is not yet in operation. A separate update will follow once the Shuttle Tebrau train service resumes.

KTM Komuter Train Services

Tanjung Malim – KL Sentral – Pelabuhan Klang effective 15 July 2020
Pelabuhan Klang – KL Sentral – Tanjung Malim effective 15 July 2020

KTM Komuter Timetable Pel Klang Tg Malim 20200715

Batu Caves – KL Sentral – Pulau Sebang (Tampin) effective 15 July 2020
Pulau Sebang (Tampin) – KL Sentral – Batu Caves effective 15 July 2020

KTM Komuter Timetable Batu Caves Tampin 20200715

Butterworth – Padang Besar effective 6 June 2020
Padang Besar – Butterworth effective 6 June 2020
Butterworth – Padang Rengas effective 6 June 2020
Padang Rengas- Butterworth effective 6 June 2020


For individual train service information, please click on the following links to learn more:

🚄 ETS

🚄 ETS Business Class: https://railtravelstation.com/ktm-berhad/ets/ets-business-class/
🚄 ETS Platinum Standard: https://railtravelstation.com/ktm-berhad/ets/ets-platinum-standard/
🚄 ETS Platinum: https://railtravelstation.com/ktm-berhad/ets/ets-platinum/
🚄 ETS Gold: https://railtravelstation.com/ktm-berhad/ets/ets-gold/
🚄 ETS Silver: https://railtravelstation.com/ktm-berhad/ets/ets-silver/

🚂 KTM Intercity

🚂 Ekspres Rakyat Timuran: https://railtravelstation.com/ktm-berhad/ktm-intercity/ekspres-rakyat-timuran/
🚂 Ekspres Selatan: https://railtravelstation.com/ktm-berhad/ktm-intercity/ekspres-selatan/
🚂 Shuttle Tebrau: https://railtravelstation.com/ktm-berhad/ktm-intercity/shuttle-tebrau/
🚂 Shuttle Timur: https://railtravelstation.com/ktm-berhad/ktm-intercity/shuttle-timur/

🚈 KTM Komuter

🚈 KTM Komuter Klang Valley Sector: https://railtravelstation.com/ktm-berhad/ktm-komuter/ktm-komuter-klang-valley-sector/
🚈 KTM Komuter Northern Sector: https://railtravelstation.com/ktm-berhad/ktm-komuter/ktm-komuter-northern-sector/

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.