New KTM Komuter Klang Valley Timetable from 23 August 2024 (Jadual Baru KTM Komuter Lembah Klang mulai 23 Ogos 2024)
A new KTM Komuter Klang Valley Sector timetable will be in place on the Tanjung Malim – Pelabuhan Klang Line from 23 August 2024 due to ongoing track works on the Klang Valley Double Track (KVDT) project, signalling upgrades between Rawang and Kepong, and track works due to a derailment on the down main line between Batang Kali and Serendah. Notably, train services between Rawang and Tanjung Malim are drastically reduced, with trains every 2 hours during off-peak periods.
Here are the timetables for the KTM Komuter Klang Valley Sector from 23 August 2024 for weekdays, and from 24 August 2024 on weekends.
KTM Komuter Klang Valley Sector Timetable effective 23 August 2024
KTM Komuter Klang Valley Sector Weekday Timetable effective 23 August 2024
Batu Caves-Pulau Sebang (Tampin) Line
- Batu Caves ► Sentul ► Kuala Lumpur ► KL Sentral ► Kajang ► Bangi ► Seremban ► Sungai Gadut ► Pulau Sebang (Tampin)
- Batu Caves ► Sentul ► Kuala Lumpur ► KL Sentral ► Kajang ► Bangi ► Seremban ► Sungai Gadut
- Batu Caves ► Sentul ► Kuala Lumpur ► KL Sentral ► Kajang ► Bangi
- Batu Caves ► Sentul ► Kuala Lumpur ► KL Sentral ► Kajang
- Sentul ► Kuala Lumpur ► KL Sentral ► Kajang ► Bangi ► Seremban ► Sungai Gadut ► Pulau Sebang (Tampin)
- Sentul ► Kuala Lumpur ► KL Sentral ► Seremban ► Sungai Gadut ► Pulau Sebang (Tampin) (Express)
- Pulau Sebang (Tampin) ► Sungai Gadut ► Seremban ► Bangi ► Kajang ► KL Sentral ► Kuala Lumpur ► Sentul ► Batu Caves
- Pulau Sebang (Tampin) ► Sungai Gadut ► Seremban ► KL Sentral ► Kuala Lumpur ► Sentul (Express)
- Sungai Gadut ► Seremban ► Bangi ► Kajang ► KL Sentral ► Kuala Lumpur ► Sentul ► Batu Caves
- Bangi ► Kajang ► KL Sentral ► Kuala Lumpur ► Sentul ► Batu Caves
- Kajang ► KL Sentral ► Kuala Lumpur ► Sentul ► Batu Caves
Tanjung Malim – Pelabuhan Klang Line
- Tanjung Malim ► Rawang ► KL Sentral
- Tanjung Malim ► Rawang ► KL Sentral ► Subang Jaya ► Pelabuhan Klang
- Rawang ► KL Sentral ► Subang Jaya ► Pelabuhan Klang
- Rawang ► KL Sentral
- Kuala Lumpur ► KL Sentral ► Subang Jaya ► Pelabuhan Klang (Express)
- Pelabuhan Klang ► Subang Jaya ► KL Sentral ► Rawang ► Tanjung Malim
- Pelabuhan Klang ► Subang Jaya ► KL Sentral ► Rawang
- Pelabuhan Klang ► Subang Jaya ► KL Sentral ► Kuala Lumpur
- KL Sentral ► Rawang ► Tanjung Malim
- KL Sentral ► Rawang
KTM Komuter Klang Valley Sector Weekend Timetable effective 24 August 2024
Batu Caves-Pulau Sebang (Tampin) Line
- Batu Caves ► Sentul ► KL Sentral ► Kajang ► Bangi ► Seremban ► Sungai Gadut ► Pulau Sebang (Tampin)
- Batu Caves ► Sentul ► KL Sentral ► Kajang ► Bangi ► Seremban ► Sungai Gadut
- Batu Caves ► Sentul ► KL Sentral ► Kajang ► Bangi
- Pulau Sebang (Tampin) ► Sungai Gadut ► Seremban ► Bangi ► Kajang ► KL Sentral ► Sentul ► Batu Caves
- Sungai Gadut ► Seremban ► Bangi ► Kajang ► KL Sentral ► Sentul ► Batu Caves
- Bangi ► Kajang ► KL Sentral ► Sentul ► Batu Caves
Tanjung Malim – Pelabuhan Klang Line
- Tanjung Malim ► Rawang ► KL Sentral
- Tanjung Malim ► Rawang ► KL Sentral ► Subang Jaya ► Pelabuhan Klang
- Rawang ► KL Sentral ► Subang Jaya ► Pelabuhan Klang
- Pelabuhan Klang ► Subang Jaya ► KL Sentral ► Rawang ► Tanjung Malim
- Pelabuhan Klang ► Subang Jaya ► KL Sentral ► Rawang
- KL Sentral ► Rawang ► Tanjung Malim
- KL Sentral ► Rawang
Links attached are no longer hosted on Google Drive as RailTravel Station is too often confused with the timetable provider instead of KTM. Should the links be down, it is on KTM’s servers and not on mine.




