SMRT East-West Line Changi Airport Extension First Train from Changi Airport to Tanah Merah at 5.31am (Monday to Saturday)

SMRT CAE CGA TNM First Train 001

The SMRT East-West Line Changi Airport Extension (CAE) is a shuttle on a branch line from Changi Airport to Expo and Tanah Merah Interchange, operating at most times throughout the day. The first train from Changi Airport to Tanah Merah Interchange to departs reasonably early at 5.31am, allowing for a connection to the second East-West Line train of the day to the city, Joo Koon and Tuas Link.

With my early/late flight arrival from Bangkok, depending on how you look at it, I decided to wait for the first CAE train to get home since I wasn’t in any rush this early in the morning.

SMRT CAE CGA TNM First Train 002

The LED information of the first train arriving into Changi Airport for Tanah Merah. The first CAE train out of Changi Airport is formed by the first train in to Changi Airport from Tanah Merah.

SMRT CAE CGA TNM First Train 003SMRT CAE CGA TNM First Train 004

The full CAE first train and last train information as posted on the sign by the Changi Airport station entrance at Terminal 2 Departure Hall.

Do note that the first CAE train from Changi Airport to Tanah Merah departs at 5.31am on Mondays to Saturdays only. On Sundays and Public Holidays, the first CAE train from Changi Airport to Tanah Merah departs at 5.59am.

SMRT CAE CGA TNM First Train 005

Heading down the long escalator to the station.

SMRT CAE CGA TNM First Train 006SMRT CAE CGA TNM First Train 007

Heading down again from the T2-T3 Linkbridge level to the station.

SMRT CAE CGA TNM First Train 008

The concourse of Changi Airport MRT Station is level with the platform.

SMRT CAE CGA TNM First Train 009SMRT CAE CGA TNM First Train 010

Waiting for the first CAE train to arrive.

SMRT CAE CGA TNM First Train 011

The interior of the SMRT KHI EMU serving on this first CAE westbound train service to Tanah Merah Interchange.

SMRT CAE CGA TNM First Train 012

I don’t like the standing area though.

SMRT CAE CGA TNM First Train 013SMRT CAE CGA TNM First Train 014

The route map of the East-West Line CAE as shown on the SMRT Active Route-map and Information System (STARiS).

SMRT CAE CGA TNM First Train 015

Making a brief stop at Expo Interchange. Change here for the Downtown Line to the city, Chinatown and Bukit Panjang.

SMRT CAE CGA TNM First Train 016

At Tanah Merah Interchange, alight at Platform B on the left for East-West Line train service to the city, Joo Koon and Tuas Link.

SMRT CAE CGA TNM First Train 017

It is a simple cross-platform transfer to Platform B from the middle platform which the CAE uses.

SMRT CAE CGA TNM First Train 018

It’s not too long a wait for the second East-West Line train to Tuas Link.

SMRT CAE CGA TNM First Train 019

The overly-simplified East-West Line route map on the half-height platform screen doors (HHPSD) at Platform B. Do note that this is not an express East-West Line service to City Hall and Tuas Link.

SMRT CAE CGA TNM First Train 020

Boarding the second train to Tuas Link at 5.41am.

SMRT CAE CGA TNM First Train 021

The route map of the East-West Line as shown on the STARiS.

SMRT CAE CGA TNM First Train 022

The passenger load is rather healthy for the second westbound East-West Line train of the day this early in the morning, with lots of passengers transferring to this train from the first CAE train from Changi Airport. With the second East-West Line train, most if not all public transport will be up by the time this train arrives at your destination, so you can connect to other modes of public transport with ease from this East-West Line train onwards.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.