The Korea Rail Network Authority (KRNA) is the leader of the Korean Consortium vying for the Singapore – Kuala Lumpur High Speed Rail Project. For this purpose,
Author: RailTravel Station
KTM Komuter Timetable (15 December 2015)
Click here to visit the KTM Komuter section. The KTM Komuter timetable will be changed on 15 December 2015 for 6 months on a trial
KTM Komuter Fare Increase (2 December 2015)
KTM Komuter fares for the Tanjung Malim – Sungai Gadut and Batu Caves – Pelabuhan Klang Lines will be following the new fare structure implemented
RapidKL Ampang Line Extension (Sri Petaling – Kinrara BK5)
The Sri Petaling Line Extension now operates between Sri Petaling and Bandar Puteri. Click here for more information. The Ampang Line Extension between Sri Petaling

Shuttle 61dn: Gemas to Johor Bahru by Train (Former Malayan Tiger Train Coaches)
The Shuttle JB Sentral – Gemas is no longer in operation. The Shuttle 61dn departs 15 minutes after the scheduled arrival of the EG9203 from Padang
ETS Gold: Kuala Lumpur to Gemas by Train
With the new ETS services to Gemas, travel time between Gemas and other stations along the line such as Pulau Sebang (Tampin) and Seremban