After arriving from the Railink, I headed to the Skytrain station to continue my way to Terminal 2.
Heading up the escalator to the platform.
As the train was already there, I made a dash for it to minimise a 13 minute wait for the next train.
Boarding the Skytrain at Airport Railway Station.
Heading off to Terminal 2.
Alighting at Terminal 2 for my Indonesia AirAsia flight.
This time, departing passengers were directed up to the linkbridge which is finally completed.
Heading to the linkbridge above the platforms.
There is step-free access on to the linkbridge.
Heading down the travellator.
The linkbridge crosses the main driveways of Terminal 2.
Heading down the ramp on the other end of the linkbridge.
Heading down the escalator to Terminal 2.
The escalator leads to the entrance door of the terminal building.
However, the entrance door was still under maintenance, so the path leads out to the driveway.
Continuing straight to the terminal.
Heading into the terminal through the A&W outdoor dining area to continue on for my flight back to Singapore.