New KTM ETS Train Timetable from 18 April 2026 (Jadual Baru KTM ETS mulai 18 April 2026)
A new ETS train timetable will be in place from 18 April 2026 due to infrastructure upgrading works under the Klang Valley Double Track Phase 2 (KVDT2) Project between Salak Selatan and Seremban. Two (2) ETS trains involving significant timetable and train number adjustments as follows:
| Current operating time | Operating time from 18 April |
|---|---|
| Train No.: EP9536 | Train No.: EP9530 |
| Route: JB Sentral – KL Sentral | Route: JB Sentral – KL Sentral |
| Departure: 8.30pm | Departure: 3.00pm |
| Arrival: 12.50am (+1) | Arrival: 7.20pm |
| Current operating time | Operating time from 18 April |
|---|---|
| Train No.: EP9537 | Train No.: EP9535 |
| Route: KL Sentral – JB Sentral | Route: KL Sentral – JB Sentral |
| Departure: 9.10pm | Departure: 8.00pm |
| Arrival: 1.30am | Arrival: 12.20am (+1) |
Affected ETS Platinum 9536/9537 customers may receive a 100% refund into the KITS Wallet and rebook for a new train at existing flexi fare rates.


This rescheduling is to facilitate track upgrade works over a distance of 67 km to be carried out more safely, orderly and efficiently, while also helping to accelerate the implementation timeline of the KVDT2 project so that it can be completed ahead of the scheduled time.
This implementation involves operations using a single-track system to ensure the continuity of passenger and freight train services on the affected route.
The rationale for this implementation involves upgrading the track system, signalling, and related infrastructure in order to improve operational safety, train ride stability, service efficiency, and the long-term reliability of the rail system.
The implementation of this rescheduling is important to enable critical works to be carried out within a more optimal timeframe, thereby helping to expedite completion of the KVDT2 project ahead of schedule and reduce the risk of prolonged disruption in future.
The project implementation period is expected to last until end-December 2026.
Here are the ETS train timetables effective 18 April 2026.
KTM ETS Train Timetable effective 18 April 2026
KTM ETS Northbound Timetable effective 18 April 2026
- JB Sentral ► Segamat ► KL Sentral
- JB Sentral ► Segamat ► KL Sentral ► Ipoh ► Butterworth
- JB Sentral ► Segamat ► KL Sentral ► Ipoh ► Padang Besar
- Segamat ► KL Sentral ► Ipoh ► Butterworth
- KL Sentral ► Ipoh
- KL Sentral ► Ipoh ► Butterworth
- KL Sentral ► Ipoh ► Padang Besar
KTM ETS Southbound Timetable effective 18 April 2026
- Padang Besar ► Ipoh ► KL Sentral ► Segamat ► JB Sentral
- Padang Besar ► Ipoh ► KL Sentral
- Butterworth ► Ipoh ► KL Sentral ► Segamat ► JB Sentral
- Butterworth ► Ipoh ► KL Sentral ► Segamat
- Butterworth ► Ipoh ► KL Sentral
- Ipoh ► KL Sentral
- KL Sentral ► Segamat ► JB Sentral
KTM ETS & KTM Intercity Train Ticket Booking Methods
- KTM ETS & KTM Intercity ticket counters at stations
- Online from 12Go Asia (joint ticketing with connecting trains available)
- Online from Baolau
- Online from BusOnlineTicket
- Online from Easybook
- Online from the KTMB Integrated Ticketing System (KITS)
How do I book KTM ETS & KTM Intercity train tickets online on the KTMB Integrated Ticketing System (KITS)?
How do I book KTM Shuttle Tebrau train tickets online on the KTMB Integrated Ticketing System (KITS)?
Hotel Booking
Attractions Booking
- Klook (Get FREE S$5/RM15 voucher for your first purchase when you sign up here! *subject to exchange rate)
How do I book KTM train tickets online?
- Click here for a step-by-step guide for 12Go Asia.
- Click here for a step-by-step guide for Easybook.
- Click here for a step-by-step guide for KTMB Integrated Ticketing System (KITS).
To contact KTM Berhad:
Official Website
http://www.ktmb.com.my/
Call Center
Phone: +60 3 2267 1200
Email: callcenter@ktmb.com.my
Facebook
https://www.facebook.com/ktmberhad/
Twitter
https://twitter.com/ktm_berhad









