KTM Komuter Additional Trains from 4 to 29 April 2022 for Ramadhan 2022
There will be additional KTM Komuter Klang Valley Sector trains during the weekday evening peak period for Ramadhan 2022 from 4 to 29 April 2022. The additional KTM Komuter Klang Valley Sector trains are scheduled to get commuters home in time for Iftar to break fast.
The Ramadhan 2022 additional KTM Komuter Klang Valley Sector trains are:
- Batu Caves – Pulau Sebang (Tampin) Line 2151dn from Sentul to Pelabuhan Klang via KL Sentral (4.35pm)
- Tanjung Malim – Pelabuhan Klang Line 2049dn from Batu Caves to Sungai Gadut via KL Sentral (4.08pm) and Seremban
- Tanjung Malim – Pelabuhan Klang Line 2051dn from Batu Caves to Pulau Sebang (Tampin) via KL Sentral (4.53pm) and Seremban
- Tanjung Malim – Pelabuhan Klang Line 2044up from Sungai Gadut to Batu Caves via Seremban and KL Sentral (5.28pm)
- Tanjung Malim – Pelabuhan Klang Line 2048up from Sungai Gadut to Batu Caves via Seremban and KL Sentral (6.41pm)
Ramadhan 2022 Additional KTM Komuter Klang Valley Sector Trains Timetable (Weekdays)
Batu Caves – Pulau Sebang (Tampin) Line
- Batu Caves ► KL Sentral ► Sungai Gadut ► Pulau Sebang (Tampin)
- Pulau Sebang (Tampin) ► Sungai Gadut ► KL Sentral ► Batu Caves
Tanjung Malim – Pelabuhan Klang Line
- Tanjung Malim ► Sungai Buloh ► KL Sentral
- KL Sentral ► Sungai Buloh ► Tanjung Malim
- Tanjung Malim ► Sungai Buloh
- Sungai Buloh ► Tanjung Malim
- KL Sentral ► Klang ► Pelabuhan Klang
- Pelabuhan Klang ► Klang ► KL Sentral
- Klang ► Abdullah Hukum
- Abdullah Hukum ► Klang
- Kuala Lumpur ► Sentul
- Sentul ► KL Sentral
There are no additional trains running on weekends. The existing KTM Komuter Klang Valley Sector timetable applies. Click here for KTM Komuter Klang Valley Sector information.