Free KTM Komuter Klang Valley Sector Rides for 1 Month from 16 June 2022
There will be free travel on KTM Komuter Klang Valley Sector train services for 1 month starting from from 16 June 2022. This free KTM Komuter Klang Valley Sector travel was announced by Malaysia Prime Minister Dato’ Sri Ismail Sabri bin Yaakob at the opening of MRT Putrajaya Line Phase 1. Free travel on KTM Komuter Klang Valley Sector also includes SkyPark Link train services.
There will also be free travel on Rapid KL MRT, LRT, BRT, Monorail, and bus services for 1 month starting from 16 June 2022.
The Malaysian Government has provided RM155 million in subsidies for this 1 month of free travel on Rapid KL public transport and KTM Komuter Klang Valley Sector train services. “I hope every city folk will take this opportunity to try public transport. Leave your vehicles at Park N Ride,” Dato’ Sri Ismail Sabri bin Yaakob said.
KTM Komuter Klang Valley Sector Stopping Stations
Stesen Perhentian KTM Komuter Sektor Klang Valley
Batu Caves – Pulau Sebang (Tampin) Line
Laluan Batu Caves – Pulau Sebang (Tampin)
- Batu Caves Railway Station
- Taman Wahyu Railway Station
- Kampung Batu Railway Station – Interchange with MRT Putrajaya Line
- Batu Kentonmen Railway Station
- Sentul Railway Station
- Putra Railway Station
- Bank Negara Railway Halt
- Kuala Lumpur Railway Station
- Sentral Kuala Lumpur Railway Station (KL Sentral)
- MidValley Railway Halt
- Seputeh Railway Station
- Salak Selatan Railway Station
- Bandar Tasik Selatan Railway Station
- Serdang Railway Station
- Kajang Railway Station
- Kajang 2 Railway Station (To be commissioned)
- UKM Railway Station
- Bangi Railway Station
- Batang Benar Railway Station
- Nilai Railway Station
- Labu Railway Station
- Tiroi Railway Station
- Seremban Railway Station
- Senawang Railway Station
- Sungai Gadut Railway Station
- Rembau Railway Station
- Pulau Sebang Railway Station (Tampin Railway Station)
Tanjung Malim – Pelabuhan Klang Line
Laluan Tanjung Malim – Pelabuhan Klang
- Tanjung Malim Railway Station
- Kuala Kubu Bharu Railway Station
- Rasa Railway Station
- Batang Kali Railway Station
- Serendah Railway Station
- Rawang Railway Station
- Kuang Railway Station
- Sungai Buloh Railway Station – Interchange with MRT Putrajaya Line
- Kepong Sentral Railway Station – Interchange with MRT Putrajaya Line
- Kepong Railway Station
- Segambut Railway Station
- Putra Railway Station
- Bank Negara Railway Halt
- Kuala Lumpur Railway Station
- Sentral Kuala Lumpur Railway Station (KL Sentral)
- Abdullah Hukum Railway Station
- Angkasapuri Railway Station
- Pantai Dalam Railway Station
- Petaling Railway Station
- Jalan Templer Railway Station
- Kampung Dato Harun Railway Halt
- Seri Setia Railway Station
- Setia Jaya Railway Station
- Subang Jaya Railway Station
- Batu Tiga Railway Station
- Shah Alam Railway Station
- Padang Jawa Railway Station
- Bukit Badak Railway Station
- Klang Railway Station
- Teluk Pulai Railway Station
- Teluk Gadong Railway Station
- Kampung Raja Uda Railway Station
- Jalan Kastam Railway Station
- Pelabuhan Klang Railway Station
SkyPark Link Stopping Stations
Stesen Perhentian SkyPark Link
- Sentral Kuala Lumpur Railway Station (KL Sentral)
- Subang Jaya Railway Station
- Terminal Skypark Railway Station
MRT Putrajaya Line Phase 1 between Kwasa Damansara MRT Station and Kampung Batu MRT Station has opened on Thursday, 16 June 2022, at 3pm.
MRT Putrajaya Line Phase 1 Route Map
The 12 stations in the MRT Putrajaya Line (PY Line) Phase 1 are:
- Kwasa Damansara MRT Station – Formerly on MRT Kajang Line (KG Line) / Interchange with MRT Kajang Line (KG Line)
- Kampung Selamat MRT Station –Formerly on MRT Kajang Line (KG Line)
- Sungai Buloh MRT Station – Formerly on MRT Kajang Line (KG Line) / Interchange with KTM Komuter Klang Valley Sector
- Damansara Damai MRT Station
- Sri Damansara Barat MRT Station
- Sri Damansara Sentral MRT Station
- Sri Damansara Timur MRT Station – Interchange with KTM Komuter Klang Valley Sector
- Metro Prima MRT Station
- Kepong Baru MRT Station
- Jinjang MRT Station
- Sri Delima MRT Station
- Kampung Batu MRT Station – Interchange with KTM Komuter Klang Valley Sector
Kampung Batu MRT Station is the closest to Kuala Lumpur city centre, but not reaching down enough just yet. I have created a simple guide on how to connect further to the LRT Ampang and Sri Petaling Lines from the MRT Putrajaya Line Phase 1 as an interim solution.
Click here for my MRT Putrajaya Line Phase 1 High Frequency Connections Guide to Kuala Lumpur!
MRT Putrajaya Line Future
The second phase from Kampung Batu MRT Station to Putrajaya Sentral MRT Station will open in January 2023, allowing trains to run the entire PY Line alignment to Kentonmen, Jalan Ipoh, Sentul Barat, Titiwangsa, Hospital Kuala Lumpur, Raja Uda, Ampang Park, Persiaran KLCC, Conlay, Tun Razak Exchange, Chan Sow Lin, Kuchai, Taman Naga Emas, Sungai Besi, Serdang Raya Utara, Serdang Raya Selatan, Serdang Jaya, UPM, Taman Equine, Putra Permai, 16 Sierra, Cyberjaya Utara, Cyberjaya City Centre, and Putrajaya Sentral.
The MRT Putrajaya Line (PY Line) was previously known as the MRT Sungai Buloh–Serdang–Putrajaya Line (SSP Line).
2 comments